Millennium Residence Bangkok, Updates

SMATV Distribution System Testing Tower A, B, C and D

 

Please be informed that the Millennium Residence SMATV contractor will carry out the distribution system testing in the shaft room of each floor as per the following schedule:

 

Tower

Floor

Date

Time

A

41 – 50

 4 January 2017

10 am. – 5 pm.

B

8 – 52

5 – 9 January 2017

10 am. – 5 pm.

C

8 – 50

10 – 12 January 2017

10 am. – 5 pm.

D

850

13 – 17 January 2017

10 am. – 5 pm.

 

 

You may encounter the noise during the mention period.

 

 

———————————————————————————————————————————————-

  

??????

 

??????    ????????????????????????????? ????? ?? ?? ?? ??? ??

?????   ??????????? ?????????????????????

          ?????? SMATV ?????????????????????????????????????????????????????????????????? ??????????????????????????????? ??????

?????

????

??????

????

??

41 – 50

4 ?????? 2560

10.00 – 17.00 ?.

??

8 – 52

5 – 9 ?????? 2560

10.00 – 17.00 ?.

??

8 – 50

10 – 12 ?????? 2560

10.00 – 17.00 ?.

??

8 – 50

13 – 17 ?????? 2560

10.00 – 17.00 ?.

 

          ??????????????????????????????????????????????????

 

 

 

Summary
SMATV Distribution System Testing Tower A, B, C and D
Article Name
SMATV Distribution System Testing Tower A, B, C and D
Description
Please be informed that the Millennium Residence SMATV contractor will carry out the distribution system testing in the shaft room of each floor as per this published schedule.
Author
Publisher Name
Millennium Residence Bangkok
Publisher Logo

Join The LINE Group ★ For Co-Owners & Tenants Only

X